Fix Nairobi
Unfinished Projects Tracker
Nairobians have paid for projects that were never finished. This register records each one with its money trail and its sources, so we know what to complete first.
How to read the evidence labels
- ✓ Verified
- Checked by the campaign against an official document or on-site inspection.
- Sourced
- Reported by a credible published source (official report or established media). Not independently verified by the campaign.
- ⚠ Unconfirmed
- An allegation, claim or unconfirmed report. Shown for transparency; treat with caution.
- Projects listed
- 3
- Stalled, abandoned or incomplete
- 3
- Contract value (where known)
- KSh 344.1 million
- Paid so far (where known)
- KSh 165.1 million
- StalledSourced
Mama Lucy Kibaki Hospital, Phase II
Mama Lucy Kibaki Hospital
Second-phase works at Mama Lucy Kibaki Hospital reported as stalled by the Auditor-General.
- Contract value
- KSh 344.1 million
- Paid
- KSh 165.1 million
Last verified 1 January 2026Full record: Mama Lucy Kibaki Hospital, Phase II → - AbandonedSourced
Pumwani Lucky Summer Dispensary
As named in the audit (location to be confirmed)
One of three health facilities (combined cost KSh 869 million) that the Auditor-General found abandoned by the contractor; inspection in September 2023 found works had barely started.
- Contract value
- Not available
- Paid
- Not available
Last verified 1 January 2026Full record: Pumwani Lucky Summer Dispensary → - AbandonedSourced
Pumwani Majengo Health Centre
Majengo (to be confirmed)
Found incomplete and unlabelled, with no perimeter wall, during the Auditor-General's inspection in September 2023.
- Contract value
- Not available
- Paid
- Not available
Last verified 1 January 2026Full record: Pumwani Majengo Health Centre →
Know of a stalled project that is missing? Tell us about it. Every entry is checked against official documents before it is marked verified.